Basically all the plumbing fixtures are now in and fully functioning as are the light fixtures. Door hardware is installed. Spent the majority of the weekend trimming out around windows and doors. Picked up the wood flooring today and dropped in off. It needs to set in the environment for a week or so before installing so I will be putting that in between Christmas and New Years.
Bathroom vanity light. Ready for mirrors.
Wood flooring ready to be installed
Morning surprise
Casing around doors. Will paint the exterior door in the spring.
Kitchen sink and Formica counters
Door hardware
Pocket door hardware
Lights over bar eating area
Casing around windows and sliding doors
Hall lights
What a great vanity fixture ... :-)
ReplyDeleteBig window sure looks nice all cased in ... everything looks nice finished off with casing.
Snow ... I'm almost frozen just looking at the pictures ... :-)